DSITI Integrated FitoutFebruary 2017
Creation of a collaborative workspace environment, introducing multiple new tenancies across two floors with an area of approximately 5,700m2. The works also included the construction of a shared event space – a grandstand spanning across two floors within the heritage atrium of the building. The project utlised raw and natural elements such as timber and ply wood to tie in with the existing structure. New timber flooring was installed to the full extent of both floors.